Most expensive kitchen mistakes are decisions made too late: an appliance chosen after cabinet drawings, a door that collides, or a service change discovered after installation begins.
Approving drawings without testing movement
Check every door, drawer, appliance and person’s path. Review corner conflicts, dishwasher loading, fridge clearance and where someone stands while another person passes.
Selecting appliances too late
Exact models affect openings, ventilation, power, plumbing and panels. “Standard size” is not precise enough for final cabinetry.
Underestimating storage behaviour
A long list of cabinets does not guarantee useful storage. Measure tall bottles, cookware, bins, small appliances and food containers, then design around them.
Ignoring existing conditions
Walls, floors and ceilings may not be square or level. Moisture damage and old services may only become visible after removal. Allow time and contingency for verification.
Poor sequencing
Cabinetry, benchtops, plumbing, electrical, splashbacks, flooring and painting depend on one another. Confirm responsibilities and hold points before demolition.
Practical checklist
- Freeze appliance models before manufacture.
- Sign off dimensions and finishes.
- Keep a contingency.
- Use licensed trades where required.
The practical takeaway
Careful scoping is less exciting than choosing colours, but it is what keeps the renovation coherent once work begins.